PriceList for Lean Production Management - PMS and RFID paper roll storage management – GOJON

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our mission is usually to turn into an innovative provider of high-tech digital and communication devices by furnishing benefit added design and style, world-class manufacturing, and service capabilities for Reel Stand, Tubular Chain Conveyor, Laminating Machine, We are confident that there will be a promising future and we hope we can have long term cooperation with customers from all over the world.
PriceList for Lean Production Management - PMS and RFID paper roll storage management – GOJON Detail:

Synchronization Control

7D1111

The synchronization means control single facer speed, it can keep same speed with the main canvas belt. Its role is to avoid excessive paper accumulation or pull off the bridge paper. Because speed rapid change, easy to shake machine, poor corrugated flute, poor bonding and other issues; health management will be based on characteristics of the individual motors at different speeds to provide different speed control curve, try to slow down the speed change, and get stable corrugated flute and glue (paste) uniform.

Overhead Bridge Paper Accumulation Control

7D1111

Overhead bridge control, not only to avoid the paper cutter and paper accumulation problems, and affect the accuracy of the entire wet paper change and manual tear sheet automatic compensation.The reason is simple, the entire production line, in addition to the paper wavy bridge plot is not easy to estimate, but the distance is almost fixed data from mill roller to climbing belt, as well as from the bridge suction paper guide to NC cutter. Really want to count, it is how to calculate the actual volume of paper bridge, as well as the amount of automatic detection compensation for doing bad paper torn by worker on the bridge.

For bridge detection and control, tracking and flow control technology; the one hand, track actual paper accumulation, on the other hand, use climbing belt feed amount and bridge suction guide paper output amount, to measure by flow control. The difference between the two amounts (bridge tear amount) feedback synchronization control automatically, to achieve compensation and a fixed bridge accumulation.

Auto Splicer Control

7D1111

Automatic splicing machine is not only connected to the control at the appropriate time, it also includes bridge accumulation, synchronous, slow down, before splicing paper, and paper control from paper head feed into the corrugating roll till recovery etc, series of control

Double Side Display LCD

Real-time display of the current production of several meters, the remaining number of meters;

Real-time display of the current vehicle number, the average number of vehicles;

Configuration

7D1111

Single facer control cabinet

Double facer control cabinet

Dry end control cabinet

Double side Display LCD


Product detail pictures:

PriceList for Lean Production Management - PMS and RFID paper roll storage management – GOJON detail pictures

PriceList for Lean Production Management - PMS and RFID paper roll storage management – GOJON detail pictures


Related Product Guide:

So that you can finest fulfill client's demands, all of our operations are strictly performed in line with our motto "High Excellent, Competitive Price, Fast Service" for PriceList for Lean Production Management - PMS and RFID paper roll storage management – GOJON , The product will supply to all over the world, such as: Swiss, UAE, Spain, We always insist on the management tenet of "Quality is first, Technology is basis, Honesty and Innovation".We are able to develop new products continuously to a higher level to satisfy different needs of customers.
  • This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Roberta from Ghana - 2017.06.19 13:51
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Clementine from Wellington - 2018.09.23 17:37
    Write your message here and send it to us